Feed water for the turbine

Feed water supply

Feed water is necessary for the entire power plant circulation. After being vaporised in the boiler, it is conducted into the turbine at high pressure. If sufficient feedwater is not available, electricity production comes to a standstill. For that reason the measurement instrumentation is often laid out redundantly in the feed water vessel. An inspection glass for power-off fault conditions is also built in.

VEGAFLEX 66 in the feed water tank

Independent of condensate as well as high process temperatures and pressures, VEGAFLEX 66 ensures very high measurement accuracy and reliability in the bypass tube. It can also be used to lay out the measurement loop acc. to SIL 2 or implemented acc. to SIL 3 in conjunction with the vibrating level switch VEGASWING 66. Safety-related implementation enables both overfill and dry run protection.

 

VEGASWING 61 as redundant dry run protection

To provide reliable detection of the minimum level in the vessel, often two but sometimes even three VEGASWING 61 vibrating level switches are deployed. As a single device it can also be used as dry run protection in safety-related systems up to SIL 2 (with redundancy up to SIL 3).

VEGAFLEX 66
VEGAFLEX 66
VEGAFLEX 66Independent of product and process characteristics
VEGAFLEX 66Setup without filling
VEGAFLEX 66High dependability (SIL2)
VEGASWING 61
VEGASWING 61
VEGASWING 61Process-independent switching point
VEGASWING 61Setup without filling
VEGASWING 61High dependability (SIL2)
VEGASWING 61Recurring test via key press